
Job Information
Amazon Construction Manager, Data Center Construction in Atlanta, Georgia
Description
AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we’re the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain — and we’re looking for talented people who want to help.
You’ll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You’ll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you’ll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion.
As our Data Center Construction Manager (CM)], you will be a part of a diverse, upbeat, and creative team tasked with solving fascinating problems constructing Amazon Data Centers. Our data centers are industry-leading examples of energy efficient and cost-effective designs.
Key job responsibilities
Key job responsibilities
• Own project scope, quality, schedule, and budget for construction of new builds or general capital projects.
• Own construction project management and oversight of construction related activities.
• Work alongside partner teams such as Operations, Networking, Controls, Security, and Commissioning to build Data Centers that directly support our Customers.
• Be a leader in your specific discipline (construction management, building services, architectural, electrical or mechanical engineering).
• Represent Amazon’s owner’s representative on construction sites daily, as, interacting with construction trades.
• Be Amazon’s construction representative on multiple data centers building and capital improvement construction project sites from construction start through hand-off to operations.
• Direct interface with construction general contractors during the construction bidding, award, execution, punch-list, and closeout phases.
• Create construction project scope and request for proposals.
• Conduct negotiations with general contractors and evaluate bids and proposals with detail and accuracy.
• Manage and drive cost, schedule, and quality while managing construction contractors and vendors.
• Perform construction project management activities, including management of documents, submittals, RFIs, change orders, invoices, quality, scope, and schedule.
• Drive construction teams to troubleshoot and perform root-cause failure analysis on equipment failures.
• Support commissioning and integrated system testing and oversight.
• Support operations of installed facilities, including review of procedures, best practices, and maintenance initiatives.
• Support capital request creation.
• Analyze and report construction progress and financials.
• Record and report key construction metrics to team members and management.
• Contribute to construction initiatives aimed at improving construction efficiency and increasing data center resiliency.
• Provide constructability reviews for electrical and mechanical designs for new or optimization of existing data centers.
About the team
Diverse Experiences
Amazon values diverse experiences. Even if you do not meet all the preferred qualifications and skills listed in the job description, we encourage candidates to apply. If your career is just starting, hasn’t followed a traditional path, or includes alternative experiences, don’t let it stop you from applying.
Why AWS
Amazon Web Services (AWS) is the world’s most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating — that’s why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses.
Work/Life Balance
We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there’s nothing we can’t achieve in the cloud.
Inclusive Team Culture
Here at AWS, it’s in our nature to learn and be curious. Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences. Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon (gender diversity) conferences, inspire us to never stop embracing our uniqueness.
Mentorship and Career Growth
We’re continuously raising our performance bar as we strive to become Earth’s Best Employer. That’s why you’ll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional.
Basic Qualifications
Bachelor’s degree in Mechanical Engineering, Electrical Engineering, Construction Management or an equivalent engineering science OR 6+ years of related construction management experience in lieu of a degree.
6+ years in construction management of large, complex projects involving large-scale mechanical, electrical and plumbing (MEP) plants.
6+ years of general contractor and vendor management experience (request for proposals, bidding, change orders, quality control, RFI/submittal tracking) associated with construction and project execution.
6+ years constructing electrical engineering systems including large scale power distribution/generation gear and constructing mechanical engineering systems including cooling systems.
Preferred Qualifications
Understand electrical engineering principles including switch gear, UPS, transformers, and circuit breakers. Understand mechanical engineering principles for cooling systems.
Experience directly related to the design or construction of data centers/critical infrastructure or large scale mechanical and electrical plants.
Possess clear written and verbal communication skills and ability to use data to justify conclusions.
Value engineering: proven ability to reduce costs through creative solutions with no impact on quality and reliability (new designs, technology, or construction methods).
Amazon is committed to a diverse and inclusive workplace. Amazon is an equal opportunity employer and does not discriminate on the basis of race, national origin, gender, gender identity, sexual orientation, protected veteran status, disability, age, or other legally protected status.
Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit https://amazon.jobs/content/en/how-we-hire/accommodations for more information. If the country/region you’re applying in isn’t listed, please contact your Recruiting Partner.